Bilbao Biodiesel Plant Sale and Relocation: A Complex International Project

Discover how Perry successfully managed ๐˜๐—ต๐—ฒ ๐˜€๐—ฎ๐—น๐—ฒ ๐—ฎ๐—ป๐—ฑ ๐—ฟ๐—ฒ๐—น๐—ผ๐—ฐ๐—ฎ๐˜๐—ถ๐—ผ๐—ป ๐—ผ๐—ณ ๐—ฎ ๐—ฐ๐—ผ๐—บ๐—ฝ๐—น๐—ฒ๐˜๐—ฒ ๐—ฏ๐—ถ๐—ผ๐—ฑ๐—ถ๐—ฒ๐˜€๐—ฒ๐—น ๐—ฝ๐—น๐—ฎ๐—ป๐˜, involving international coordination, specialist dismantling, 3D mapping and approximately 70 shipping containers.

In 2019, Perry Process Equipment received an enquiry from a major Indian edible oils company looking to expand into biodiesel production. Having found Perry through Google, the customer needed a suitable plant. Our marketing, projects and purchasing teams worked together to source a solution.Following an extensive search, we identified a little-used biodiesel plant in Bilbao, Spain. After negotiating with the owner and presenting the opportunity, the Indian customer inspected the facility and agreed to purchase it.
Managing the Project
The project involved purchasing the equipment, meeting local authority and Port Authority requirements, and safely decommissioning the facility. Working with specialist Spanish companies, we arranged for the remaining product to be removed and disposed of before dismantling began. A specialist Polish team then undertook the three-month dismantling project, involving approximately 35 personnel at its peak. Removing large vessels required sections of the roof to be temporarily removed. Perry oversaw the work, ensuring safety remained a priority throughout.

International Transportation
Once dismantling was complete, approximately 70 containers, including 40ft standard containers and flat racks, were used to transport the equipment to India.To help the customer rebuild the plant independently, the facility was 3D mapped before dismantling. This provided a detailed reference for reinstallation, alongside the original equipment documentation.

Project Completion

The project was completed in April/May 2020, with the building returned to its owner in a condition suitable for reuse. From sourcing and purchasing through to decommissioning, dismantling and transportation, the project required close coordination between Perry departments and specialist companies across several countries.

https://www.perry-equipment.com/en-GB/blog/2454-biodiesel-plant-sale